Empty industrial warehouse bare concrete floor
01 — The Substrate
Every great floor starts here — a raw concrete slab. Dusty, porous, untreated. This is where we begin.
Worker with concrete floor diamond grinding machine
02 — Surface Preparation
Diamond grinding. Shot blasting. Our team walks every metre. CSP 3–4 profile. No shortcuts. The prep is 80% of the job.
Dazlac worker applying red epoxy primer to floor
03 — Primer Application
Low-viscosity epoxy primer penetrates deep — locking the surface, sealing pores, eliminating outgassing.
Dazlac workers spreading self-levelling epoxy
04 — Epoxy System Pour
Self-levelling epoxy at 2–5 mm. Mixed to ratio, poured, spread, de-aired with spiked rollers.
Finished high-gloss Dazlac epoxy floor
05 — The Dazlac Finish
High-gloss polyurethane topcoat. Seamless. Chemical-resistant. Zero dust. Built to outlast the building it covers.

Scroll to build
your floor.

scroll
2–5 mm
System thickness
15+ yrs
Service life
72 hr
Full cure time
Zero
Joints. No seams.

Industrial floors.
Engineered for Kerala.

Ask for a Quote →